The Centre for roads and geotechnique - References

  • Reparation project of the road structure of the highway M - 21, section Rzav – Kokin Brod (P. Banja), 29670 km long, in 2003;
  • Reparation project of the road structure of the highway M - 21, section Rzav – Kokin Brod (P. Banja) – Nova Varos, 9,138 km long, in 2003;
  • Reparation project of the road structure of the highway M - 21, section Nova Varos – Bistrica, 15,357 km long, in 2003;
  • Reparation project of the road structure of the highway M - 21, section Bistrica – Kolovrat , 14,946 km long, in 2003;
  • Reparation project of the road structure of the highway M - 21, section Kolovrat - Gostun, 30,901 km long, in 2003;
  • Reparation project of the road structure of the highway M -5, section Preljina – Mrcajevci, 12,229 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Beranovac – Vrnjci , 20,095 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Vrnjci - Cairi, 9,024 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Cairi - Stopanja, 11,000 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Stopanja - Citluk, 9,600 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Krusevac - Pojate, 21,548 km long, in 2002;
  • Reparation project of the road structure of the highway M -5, section Cacak - Preljina , 5,611 km long, in 2002;
  • Reparation project of the road structure in Kneza Milosa Street in Belgrade, 0.701 km long, in 2002
  • Reparation project of the road structure in Takovska Street in Belgrade, 0.512 km long, in 2002
  • Reparation project of the road structure in Voivode Misica Boulevard in Belgrade, 2.952 km long, in 2002
  • Main project of the road structure of the road R - 121, Bovan Lake - Sokobanja, in 2002
  • Production of justifiability study for the programme of the reconstruction of road network within the corridor X - Group 03, financed by the European Investment Bank (EIB), 186 km long, in 2002
  • Production of justifiability study for the programme of the reconstruction of road network within the corridor X - Group 03, financed by the European Investment Bank (EIB), 100 km long, in 2002
  • Main project of the road structure of the road R – 275, Aleksandrovac – Rasanac, 13.5 km long, in 2002
  • Main project of the road structure of the road R –113a, Loznica – Zajaca, 10.5 km long, in 2002;
  • Main project of the road structure of the road R – 208, near “Pecka”, 0.8 km long, in 2001;
  • Reparation project of the road structure of the highway M-2, Podgorica – Golubovci Airport, 8.4 km long, in 2000;
  • Reparation project of the access road to the „Beska” Bridge over the Danube, damaged after the bombing in 1999;
  • Reparation project of the road structure for two airports in Sybiria (RADUZINI i NIZNJEVA-RTOVSK), in 1995;
  • Reparation project of the road structure for the airport in Sombor, in 1996
  • Control during the reconstruction of the takeoff-landing track at the Surcin airport in Belgrade
  • Geomechanical testing of the lower formation during the construction of the railway Novi Sad – Beocin
  • Geomechanical testing of the lower formation during the construction of the railway Valjevo – Loznica – Zvornik
  • Geomechanical quality control of the performed work on the lower formation for fast railways, section: Belgrade - Stara Pazova
  • Preliminary geomechanical research for the needs of design and construction of a large number of objects, such as: a section of the highway Belgrade – Nis and Belgrade – Novi Sad, a section of the major and regional roads in Voivodina and Central Serbia
  • Design of measurements for reconstruction and reinforcement: highway Belgrade – Nis (several sections), Nis – Dimitrovgrad, Belgrade – Novi Sad, Novi Sad – Backa Palanka, Vrsac - Plandiste, city roads in Belgrade, Novi Sad, Subotica etc.
  • Supervision and/or control of work during the construction of: highway Belgrade – Pancevo, highway Novi Sad - Subotica, highway Belgrade – Nis - Leskovac – the Macedonian border (several sections)
  • Supervision and/or control of work during the construction of major roads Negotin – Zajecar – Nis, Prokuplje, Paracin – Zajecar, roads in Belgrade, Subotica, Sombor, Pancevo etc.
  • Design of road structures: highway Belgrade – Nis (reinforcement of the existing raod and a new road lane), highway through Subotica, bypassing road around Zajecar, bypassing road around Negotin, bypassing road around Sombor, Odzak, several projects for city roads in Belgrade, Sombor, Subotica, Zrenjanin etc.
  • Production of project documentation and inspection of projects: major road M-25 – bypassing road around Vratarnica, bypassing road around Negotin, phases I and II of the reconstruction of major and regional roads in Serbia, bypassing road around Smederevo, bypassing road around Krusevac, and many more objects

Gallery

Follow us

Contact us